Exchange 2003 - Latest Project

I am back blogging after a long time now. Well, just bored and tired from reading about Exchange so took a break.
Exchange 2003 , the lastest project at my company..
After reading a little about it here and there.. i think it is not as easy as it may seem. The first tast at my hand is deciding the hardware.
So i dedicating the next few days on planning the architecture, and then deciding the hardware. For our company size i think a 1 dual processor server with enough harddrive storage in Raid Configuration should be enough,, will also evaluate the need for Storage array but i doubt we would need it.
the machine.. i think will go with a 2u server with 4 channel Raid and 8 hot swap SCSI Drives. Think this should be enough .. lets see..
also need to evaluate the backup and recovery procedure...
In a way its good.. atleast something new and exciting to do..

Time frame.. well i think i should have this in production within a month.. this includes.. planning, hardware ordering, configurations, testing and deployment..

Lets see if i am being too optimistic ..

:)

@man!

Phasellus facilisis convallis metus, ut imperdiet augue auctor nec. Duis at velit id augue lobortis porta. Sed varius, enim accumsan aliquam tincidunt, tortor urna vulputate quam, eget finibus urna est in augue.

1 comment:

Anonymous said...

yes, you are being too optimistic. we're february 16 and far from deployment.